Wednesday, November 3, 2010

Busy With A Three Stories BH In Kuantan !!!



A nice and well constructed BH.

The owner wanted my help to install those tweeters and the sound system.

Initially it was the sound system but after having a good look at the BH internal I told him that he needs more then a good sound system.

Those partitioning needs to be erected so that the light from the entrance hole can be blocked and those VIP rooms on each floor.

After three days finished the tweeters installation but I was not very happy that the number was a bit too little (350 pieces). Should have at least 150 a floor.

Completed the top floor's partitioning, two for light blocking and one for the VIP room.

I was a bit not happy with the rubbish and dust left on all the 3 floors.  This must be the work of the building contractor.

Now I need to clear them.....

Took a number of pictures of this BH and looks good from the outside and the inside.

Double wall with air vent on the walls about 30 feet up.

The internal wall temperature was at 29*C and below,

The two LALs was on the same side.

The only concerned was the size of the entrance opening, top opening type.  A bit too small (9'X5').









Need to prepare those wet floor tommorrow and hope by this weekend it will be ready to operate.