The Salak Tinggi BH is getting there.

The top most floor is about 70% ready.

The walls were erected and covered with heat shield.

The roof areas were also heat shielded.

The VIP room at the back was almost done.

Last two days the nesting planks were all in place.

The boxes were done and the cluster corner covers were installed on a random basis.

A few waste wood corners were also installed inside the two VIP rooms.

Have a look at the way those nesting planks were installed.

Looks good to me and my workers now moved to focus on the second floor.