It Should Be Back In Full Swing By Tuesday !!!

 (Temperature recorded at about 4:00pm today)

Yes just a few more days the Kemaman BH under revamp will be back in full steam.

The heat insulation materials were installed on the upper floor.

The temperature inside this VIP room seems to settle down to around 27*C-29*C.

A number of partitions were erected and now all the nesting rooms are dark and comfortable.

I am sure with the extended PVC pipes attached to the ventilation holes, the birds will feel safe and protected.

There are more internal sound tweeters and fake nests now.

It used be only a few but I have decided to increase their number more than 10 folds.

I have a very strong feeling that those birds will be very happy to tenant this BH.

This morning for example my workers complained that at about 9;00 am the house was full with about 1000 birds inside.

I wonder why they seems to be very persistent in entering the unfinished BH.

The monkey house area now are painted with black paint to reduce the reflected light.

While one worker was busy with the internal sound tweeters installation the other was fixing the water pipe for two humdifiers.

They guaranteed me that by Tuesday the BH will be ready to go.

The test so far seems to be very positive.

Every birds that flew above the BH roof will enter the main entrance hole.

They will have lots of things to see and admired.

Let us hope that all will decide to stay.

 (Cutting the roof to about 5")

 (Final touch on the last partition)

 (Installation of Cluster tweeters)





 (To reduce those light from ventilation hole elbow, installed about 2.5 feet pipe)