Search This Blog

Friday, June 17, 2016

Carey Island BH: The Top Floor is 3/4 Way Done !!!



The newly erected BH is currently under my care especially in the installation of nesting planks, about 4 metric tons, sound system, humidity system and the fabrication of VIP rooms.

We focused on the top most floor and as at today the floor is almost ready.

The nesting planks were all installed, the VIP rooms (2 rooms) were all erected after the installation of two walls.

I have also erected two more walls to force those wild birds to fly above the LAL hole.

No more short cuts but they are now forced to fly above the LAL hole.

This will help to force them to fly downstairs.

I have a short discussion with the caretaker that he need to strategies to populate the lower floor up to about 300 nests and after which he can alter the bird's flying in path by removing a few cement board partition walls.

He saw what I showed him plus I carefully explained to him why and how.

Every bird that entered the BH have to fly along a specific path and during which there will be a number of external sound tweeters which will force them to fly to the VIP rooms located on the lower floor.

They either will fly to the left or right VIP room.

The top floor VIP room seem to be shaping up nicely.

I took a lot of effort to clean the planks and installed those external and internal sound tweeters.

Once they were in place the installation of fake nests and aluminium wire mesh come into play.

After a knee cramped operation I manage to installed almost 250 fake nests plus about 100 wire mesh.

Enjoy the nice pictures showing you what were installed to attract the attention of those new couples that enter the BH.

If you wanted to learn more or know more call me at 017 7551318

There is a seminar on July 23rd 2016 which you should not miss.

Once you complete the seminar you will be a very different person swiftlet farming wise.

Just drop a not at harryswiftlet@yahoo.com





















No comments: