Tuesday, June 13, 2017

Tikam Batu BH: Just Two Weeks After Revamp Operation !!!



Yesterday June 12th 2017 stayed back at Tikam Batu BH to count how many birds entered in the evening.

This BH was upgraded or revamped by my workers and after 10 days of hard work we managed to put it into operation on May 26th 2017.

The BH was with about 20-25 nests prior to my revamp operation.

The number of birds inside must be about 40-50 birds (prediction).

After 18 days of operation the number of birds jumped to 80 plus.

This is a good result and I hope within the next few months the number with triple.

The sounds systems now is superior as compared to prior to revamp works.

The floors are wet and each floor is with two VIP rooms.

All the nesting planks were cleaned and applied with attractive aroma.

The number of new internal sound tweeters touches 300 pieces.

There were many fake nests installed.

All these new features must be working well to lure all these new couples to enter and stays.

The best is to wait for another few months to see how many new bird shit spots are found below those tweeters.

Sunday, June 4, 2017

Pekan BH: After Two Days The BH Was Fully Occupied !!!



It was like a breeze passing by.

I was referring to the latest BH in Pekan Pahang which was revamped about three days ago.

I was first contacted by a person by the name of Mr Chin from Kuantan Pahang.

He wanted me to drive up to Pekan to meet a BH owner who claimed to face "Bird nests not multiplying syndrome".

The BH owner was introduced to me by Chin as Mr Tan.

The first time he met me he thinks that I am another conman prowling for a new victim.

However after asking a few questions he soon realized that Pak Harry have something special especially on his passion about swiftlet farming.

Pak Harry is not a consultant but he is a passionate swiftlet farmer.  He loves swiftlet farming and he is the only one who will expose any new method to improve a sick BH.

In his case was not an ICU BH but a normal syndrome where the nests refuse to increase.

Mr Tan BH was with about 10 kg of nests.  However it seems that the nests number stop multiplying.

He opened his BH doors for my inspection and about a week later I wrote a complete report in Bahasa.

Immediately after reading he called asking me when I can start the Phase 1.  In my visit report I explained to him the real reasons why his BH nests stop multiplying and with it I recommended him to go into Phase 1 and Phase 2.

Phase 1 is to proof that my first few recommendations will be a good start before he gauge my expertise.

I asked him to do just a few small thing.

My first recommendation was to install a hexagonal tweeter precisely above the main entrance door of his top entry BH.

My second recommendation was to reduce the width of his main door from 5' wide to 3' wide.

The door should be framed out using those excess nesting planks that were store somewhere along the staircase.

The third recommendation was to precisely install 8 external tweeters around the new LMB hole.

My last recommendation was to wet the BH floors.

He could not resist my ideas especially when I precisely inform him what is wrong with his BH and how to remove those problems.

The first day when I arrived I started with the hexagonal tweeter installation and changed the door size.

The 8 external sound tweeters were completed before 4:30 pm.

We left the BH but the slight change started to show drastic change in the number of birds started to focus on his BH.

I was there to see together with the owner.

He was very very pleased with the small intervention.

The second day was the major works.  I installed the wet floor system.

This wet floor system is the key to draw all his young birds to return to where they were hatched.

I completed the installation and set the timer to run the pump precisely during the day and night.

The smell due to the wet floor changed tremendously.

From today I advised him to use those chow chu kang shoes if he entered his BH.

I asked him not to enter the nesting rooms for at least 3-4 months.

I think there will some changes that will make him feel very very happy.

Let me share you those photos taken during the renovation works.













Thursday, June 1, 2017

Pekan BH: This Morning Ready To Take This New Challange !!!





Today will pick up my boys and travel to Pekan Pahang.

I will take about 3 hours plus minus to reach my destination from Kuala Lumpur.

Main purpose for this trip is to help this BH owner with his BH.

Based on my last trip he complained that his 9 years old BH is facing a stagnant nests syndrome.

The nests number is no longer multiplying.  It stop growing about 2-3 years ago, according to him.

I wrote my visit report about 40 pages inclusive of my observations and recommendations.

He was very happy with my findings and immediately asked me to assemble those recommended gadgets and workers.

Once arrive I need to carry out the nest count.  Once that is done I will installed a number of key gadgets to activate the nests to start multiplying.

The entrance hole will be installed with a new set of tweeters.

The nesting planks will be cleaned and installed with specialized equipment.

At the same time the floor will be wet using those specialized BH floor wetting equipment.

A new amplifier will be installed playing an additional internal sound.

The current external sound will be upgraded.

Once the installation is completed I will ask the owner to allow the BH not to be disturbed for about 3-4 months.

This will be the recuperating time after a major surgery.

Will come again to check its progress after 3-4 months.

I am sure it will back to normal with a jump in nest numbers.

Let me inform you all once the job is done.