Search This Blog

Thursday, December 18, 2014

The Erecting Of Monkey House At Rembau BH is Up And Ready !!!



The BH owner called and confirmed that his contractor have completed the Monkey house erection.

I wanted to drop by much earlier but need to focus on the presentation materials for the coming Seminar at TH Hotel Penang.

Plan to drop by soon.

My main reason in asking him to change the entrance hole have something to do with the slow growth result.

The BH original design was with a top entry type.

Now a steel structure covered with those zinc sheet helps to cover the top entry section turning the BH to a Monkey House entry type.

I was at the BH when the steel works started and told the fabricator where the two entrance windows must be located.

The main direction will be towards the pond while a second hole to face the morning sun direction.

I told him the the point to start the opening was 1.5 feet below the roof and 1.5 feet away from the corner.

I wanted the window to be higher but nearer to the wall (not in the middle).

The roof must direct the rain water to the side and not into the monkey house.

I was concerned about the water curtain when rain starts to come during the evening time.

If this happened the second window that are free from the water curtain will allow those birds to enter the monkey house.

My next job on the new structure is to install a new hexagonal tweeter and external sound tweeters.

These gadgets must be precisely located so that they will be effective to draw those birds into the BH.

I must not forget to relocate those electrical shock wires onto the window frames.

These electrical wires will prevent those owls from attacking the house.

The BH shown signs of owls entering and catching those swiftlet.

The owl prevention system must be in place as soon as possible.

Will keep you all posted when the monkey house sound system is up and running.

No comments: