Thursday, May 30, 2013

The Top Floor Is Taking Its Shape !!!

(The heat shield on the ceiling rooftop)

Yesterday was fully occupied with a Seminar conducted at Serdang Agriculture University.

Today arranged for participants to visit both the Dengkil and Salak Tinggi BHs.

We have about 20 participants and guests.

I was glad that the two days Seminar went well and I can see nearly all stayed back just wanted to than me for being so generous with all the information.

The site visit was something interesting.  Most of the participants have very little chance to visit any BH around their town.

During the site visit they learn and observed all the things that were taught during their classroom sessions.

The most interesting were the VIP rooms, the monkey house arrangements, the appropriate size of entrance hole, the opening of secondary hole for morning light, the enclosures to guide those birds to fly above the LAL, the hexagonal tweeter, the last tango system, the cluster tweeters, the chocolate tweeters, the wet floors, the bird release room and many more.

During the visit to Salak Tinggi BH they saw the heat shield being installed on the walls and the roof.

Most participants have never seen of have the faintest ideas on all those items and gadget installed in the two BHs.

I gave a special invitation for all those who wanted to inspect the Salak Tinggi BH once it is ready for operation.

Give me above two to three more weeks and please come to take a good look at how I transform the empty shop house into a top notched BH.

The conversion works on the top floor is taking shape.

The walls were all done.

The heat shield system were completed as at today.

The back VIP is taking shape with those wooden structures up and ready to be installed with those 4'X4' ceiling boards.

The nesting plank on the walls perimeters were up and ready.

I am very pleased with the progress so far.

Hope to assemble a few more gadgets before stopping by tomorrow.

Remember you are welcome to view this masterpiece during the construction.

If you wish to join the fund to help out during the erection, please call 017 7551318.

No one will offer this golden opportunity to learn about swiftlet farming but Pak Harry will.

Just pick up the phone and call the number.
(View of heat shield above the false ceiling)

(The opening waiting for me to snap some pictures)

 (Installation of heat shield on the wall facing morning sun)


 (Completed Heat Shielding on wall facing the west)


 (The nesting planks installed on the walls perimeter)

 (VIP room wall frames taking shape)