STARTED DIGGING
DUGGED AND READY 8 IN TOTAL
THE RIGHT SIZE 4.5' X 4.5'
STEEL FRAME FORMWORKS
CEMENT TRUCK READY TO POUR
NESTING PLANK RED MERANTI
PORTLAND CEMENT
RIVER SAND
VENTILATION HOLES PIPES
STEEL BARS
LOW DENSITY BRICKS 2'X1'X8"
DOORS FOR THE BH
PREPARING SOIL FOR GROUND FLOOR
LAYING OF BRICKS
BRICKS WORKS READY
LEVELED AND COVERED WITH SAND LAYER
POURING THE READY MIXED CEMENT
GET THE LEVEL RIGHT
WAITING FOR HARDENING
THE 1ST FLOOR WALLS BEGINS
MANGKUANG WATER RESERVOIR NEARBY
THIS IS WHERE THOSE SWIFTLETS STOP BEFORE
GOING HOME