BM BH From The Beginning Part 1 !!!


THE LOCATION November 12th 2008


FENCED UP

THE NEIGHBOUR



BACKHOE PUSHING A DEAD TREE DOWN


IT WAS DOWNED


CLEARED THE LAND


LEVELLING



CHANGED THE DIGGER


GETTING THE HOLE READY




GUIDE WOOD PLATE


STARTED DIGGING

DUGGED AND READY 8 IN TOTAL


THE RIGHT SIZE 4.5' X 4.5'


STEEL FRAME FORMWORKS


CEMENT TRUCK READY TO POUR



NESTING PLANK RED MERANTI


PORTLAND CEMENT


RIVER SAND


VENTILATION HOLES PIPES


STEEL BARS


LOW DENSITY BRICKS 2'X1'X8"


DOORS FOR THE BH


PREPARING SOIL FOR GROUND FLOOR


LAYING OF BRICKS


BRICKS WORKS READY


LEVELED AND COVERED WITH SAND LAYER





POURING THE READY MIXED CEMENT



GET THE LEVEL RIGHT


WAITING FOR HARDENING


THE 1ST FLOOR WALLS BEGINS



MANGKUANG WATER RESERVOIR NEARBY
THIS IS WHERE THOSE SWIFTLETS STOP BEFORE
GOING HOME