Welding onto the Steel Bars
Steel Formworks ready for cement pouring!!!
Keep the cement coming !!!
Walls Ups !!!Wooden Frame for 1st floor Beam

Wooden panel


Wooden Panel act as floor support too

About to be ready for nesting areas.

Reinforced steel mash for a 3 inch thick flooring.
Those cement are poured and dried.
2nd Floor Beam
Another Wall Up



Plastering of tunnel areas



Last Wall to be Cement Plastered


Master In Finishing Plastering


Roofing Zinc with styrofoam layer.